top of page
0.belimo-logo-black-and-white.png

Location: Danbury, CT

​

Size: 200,000-sf

​

Project Type: Manufacturing

​

Website: https://www.belimo.us

​

Accomplishments:

  • Capacity increased by over 300%.

  • Program and design of 120,000-sf of Manufacturing and Engineering Wet Lab spaces.

  • Manufacturing spaces were for minimum touches and optimum workflow.

  • Designed and implemented a high-bay, mini-load parts picking and distribution center.

  • Assisted in securing over $2M in state and local grants and incentives.

suburu, bic inc, industrial consulting, danvers massachusetts, boston industrial consulting, supply chain, facility transition, bellimo

Related Case Studies

Screen Shot 2024-05-13 at 12.50.49 PM.png
3.png

Provided detailed design and procurement efforts for material handling and storage equipment, including use of a semi-automated, high density racking storage system and multi-level conveyance system for small parts picking.

Screen Shot 2024-05-13 at 12.16.43 PM.png
2.png

Autodesk, opened its latest (BUilding, Innovation, Learning, and Design) space in South Boston waterfront’s Innovation and Design Center. They hired Boston Industrial to assist in the design and outfit of the new Incubator facility which focused on bringing Autodesk’s vision of “Imagine, Design, and Create” to the community. 

Screen Shot 2024-05-13 at 12.44.08 PM.png

​

4.png

Designed an efficient Manufacturing Center consolidating 6 unique HID operations, focusing on developing a Best-in-Class environment using Lean principles and smooth work for a consolidated assembly.

bottom of page