Location: Westbrook, ME

​

Size: 225,000-sf

​

Project Type: Industrial Engineering

​

Website: https://www.idexx.com

​

Accomplishments:

  • Implemented Vertical Lift Modules (VLMs) in -20 Freezers to increase Cold Chain Storage Density by 35%.

  • Reduced Cold Chain picking efficiency by over 25% through technology solution and WMS enhancements.

  • Participated in Master Planning to assure 3 to 5 year rapid growth objectives are met.

  • Increased workflow and throughput in Diagnostics Testing facility.

  • Improved Diagnostics Test capacity by over 40% to meet increased volume.

suburu, bic inc, industrial consulting, danvers massachusetts, boston industrial consulting, supply chain, facility transition

Related Case Studies

Screen Shot 2024-05-13 at 1.37.08 PM.png
4.png

Master Plan for a consolidation of 4 Manufacturing and Storage locations into a single facility, along with implementation of a new WMS system for parts tracking.

Screen Shot 2024-05-13 at 1.19.14 PM.png
8_edited.png

Working with NIKE Air team, Boston Industrial developed an Automated Material Handling system and detailed plant layout for a new manufacturing operation in Arizona.

bottom of page