top of page
0.johnson-johnson-logo-black-and-white (1).png

Location: Lititz, PA

Size: 750,000-sf

Project Type: Manufacturing

Website: https://www.jnj.com/

Accomplishments:

  • Increased throughput and production capacity by over 105%

  • Simulated workflow to optimize delivery to and from manufacturing.

  • Reduced on-hand Raw Materials inventory from 7.5 weeks OH to 4.3 weeks OH.

  • Improved storage efficiency in chemical storage by over 45%.

  • Expanded production lines to allow for new product production and more than 2x output.

suburu, bic inc, industrial consulting, danvers massachusetts, boston industrial consulting, supply chain, facility transition, johnson

Related Case Studies

Screen Shot 2024-05-13 at 12.50.49 PM.png
3.png

Provided detailed design and procurement efforts for material handling and storage equipment, including use of a semi-automated, high density racking storage system and multi-level conveyance system for small parts picking.

Screen Shot 2024-05-13 at 12.16.43 PM.png

Boston Scientific involved Boston Industrial Consulting in the optimization of outbound operations for the new Distribution Center, to allow for quicker turn-around times and increased volume while maintaining Six Sigma accuracy. The new, automated DC involved a full overhaul of its technology.

6_edited.png
Website_adidas.2_slider-scaled.jpg

0.belimo-logo-black-and-white.png

Belimo Americas, located in Danbury, CT is a leading manufacturer of Valves and Actuators for the HVAC and Water Flow business. Boston Industrial led Belimo through a significant programming, budgeting, construction and relocation project that helped the company double their space and output.

bottom of page