top of page
Copy of home build construction logo.png

Locations: Monterey, Mexico; Andover, MA; Pittsburg, PA; Mountaintop, PA; Groveport, OH; Coyol, Costa Rica

Project Type: Supply Chain

Website: https://www.philips.com/global

Accomplishments:

  • Saved over $8M in operational costs through Distribution Operation consolidation.

  • Successful start-up of Molding Center-of-Excellence in Costa Rica.

  • Lighting plant Distribution Center right-sizing and down-sizing, reducing North American footprint by over 300,000-sf.

  • Successful design and start-up of a 200,000-sf Lighting Manufacturing plant in Monterey, Mexico.

  • Boston Industrial / Philips partnership has extended over 19 years, 32 projects, and across 5 countries.

suburu, bic inc, industrial consulting, danvers massachusetts, boston industrial consulting, supply chain, facility transition, philips

Related Case Studies

Screen Shot 2024-04-12 at 7.48.10 PM.png
4_edited.png

Consolidated e-Commerce operations into an expanded Memphis operation that added split-case picking and automation. Reduced overall footprint and operational burden in Phoenix Distribution Center. Assisted in the shift of East Coast distribution center operations in New Jersey to a 3PL DC in Pennsylvania.

SubaruNE-e1482940209341.jpg
5.png

Boston Industrial worked closely with Subaru of New England through the procurement and implementation of warehouse equipment, software and picking technologies.

Screen Shot 2024-04-12 at 9.10.28 PM.png

3.png

Implemented a new racking, material handling, process design and Warehouse Control system, including voice picking and conveyor automation. Managed the implementation of Build-to-Suit control software and new Pick/Pack system.

bottom of page