top of page

Locations: Indianapolis, IN and Spartanburg, SC

​

Size: Over 2,000,000-sf

​

Project Type: Supply Chain

​

Website: https://www.adidas.com/us

​

Accomplishments:

  • Implemented new Automated Mobile Robot system to substantially reduce head count.

  • Increased efficiency of blanks picking by 70% to meet increased kitting and reduced order size.

  • Converted batch pick to continuous wave technology in Spartanburg DC to double output.

  • Developed flow staffing models and tools to assist in workflow management.

  • Assisted in upgrade of MA WMS to drive improved reporting and efficiency.

suburu, bic inc, industrial consulting, danvers massachusetts, boston industrial consulting, supply chain, facility transition, adidas

Related Case Studies

Screen Shot 2024-04-12 at 7.48.10 PM.png
Copy of home build construction logo.png

The Boston Industrial-Philips relationship began in 1996 when BI assisted Philips (formerly Hewlett Packard) with supply chain and manufacturing projects for its Healthcare Systems Group located on the Andover, MA campus.  The relationship extends over 17 years and 22 projects.

Screen Shot 2024-05-13 at 12.50.49 PM.png
4_edited.png

Consolidated e-Commerce operations into an expanded Memphis operation that added split-case picking and automation. Reduced overall footprint and operational burden in Phoenix Distribution Center. Assisted in the shift of East Coast distribution center operations in New Jersey to a 3PL DC in Pennsylvania.

Screen Shot 2024-04-12 at 9.10.28 PM.png

​

4.png

Assisted Tiffany with expansion programs involving Silver Manufacturing and Supply Chain Automation projects. Designed and implemented a new distribution center plan for e-commerce and catalog operations to meet the increasing demand for direct-to-consumer sales.

bottom of page